Kitchen Renovation Rough-In in Sydney
Kitchen renovation rough-in in Sydney: we set the water, waste and gas pipework before the flooring goes down and the cabinets are fixed.
Tell us what's happening

The short answer
Your cabinetmaker has given you a date, the appliances are on order, and the water and waste are still sitting exactly where the last kitchen put them decades ago. There's one good window to move them.
What happens when you get in touch
Step 1: Call or book online
Tell us what is happening. We ask the right questions and book a time that suits you.
Step 2: We find the cause
A licensed plumber diagnoses it properly, with a drain camera, leak detection or a pressure test where it helps.
Step 3: A fixed price, agreed first
You agree the price before any work starts. We quote the job, not the hour, so there are no surprise charges.
Step 4: Done right, guaranteed
We finish the job, clean up, and back our workmanship with a lifetime labour guarantee.
Step 5: You know the price first
The figure for the whole job, in writing, before anyone starts. That figure is what turns up on the invoice.
Rated 4.9 from 237 reviews
Questions and answers
Before the flooring goes down and well before the cabinets are fixed, because that's the only window where moving a sink waste is cheap. Once stone is on and cabinets are scribed in, the same change costs far more and holds the joiner up.
Yes. We work to your builder's programme and take the rough-in date from them. If you're running the job yourself, we'll tell you what has to be finished by the other trades before us so the fit-off day isn't wasted.
The joinery plans, the sink and mixer you've chosen, and the model numbers of the dishwasher, fridge, cooktop and any filter or boiling water unit.
Yes. The waste runs under the floor to the island and the trap is vented, usually with an air admittance valve inside the island. On a slab, the waste route is worked out before the island is built.
If they're galvanised steel or showing corrosion, yes. With the walls open it's a fraction of the disruption it would be later.
Yes. Our licensed gas fitters run the gas to the cooktop position at rough-in and connect and certify the cooktop at fit-off.